Project Highlights

 PIPE SLEEPER AND UNDERGROUND SERVICES PACKAGE-22 AT RAPID PROJECT

  • Year:  Feb 2017
  • Owner: BINA PURI Sdn Bhd
  • Scope: Pipe Sleeper And Underground Services Package 22 At Rapid Project (Civil And Pipeline)

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: January 2016
  • Owner: PBJV Group
  • Scope: Provision of Construction of 2 Nos Hardstand, Access Road and Ancillary Works For River Crossings at Sungai Layau and Sungai Lebam For Pengerang Gas Pipeline.

HA-MBD PROJECT PHASE (II) 

  • Year: January 2016
  • Owner: Technip Geoproduction (M) Sdn. Bhd.
  • Scope: Civil Detail Engineering Services For New Transformer and Switchgear Building.

HA-MBD PROJECTS (PHASE II)

  • Year: November 2015
  • Owner: Technip Geoproduction Sdn. Bhd.
  • Scope: CNC: Final Machining #2 sell Installation Works

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: September 2015
  • Owner: PBJV GROUP
  • Scope: RGT2- Pengerang Pipeline-Station Civil Work (SR500,SR501, ML502, ML504, ML505, OV511A, TOV511B, and TOV512) 

C&S WORKS – MAINLINE VALVE STATION AT PENGERANG, JOHOR

  • Year: September 2015
  • Owner: Petronas Gas Berhad
  • Scope: C&S Works at Mainline Valve Station For Procurement Construction And Commissioning  (PCC) of Pengerang Gas Pipeline (PGP) Project

INSTALLATION OF MECHANICAL EQUIPMENT – HA MBD PHASE 2, N.S.

  • Year: August 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia  Sdn. Bhd.
  • Scope: Installation Of Mechanical Equipment With Certified ISO 9001:2008
  • Single Lifting Of Furnace : 25 Tonnes

PROCUREMENT, FABRICATION, INSTALLATION AND COMMISSIONING OF PIPELINE AND PROCESS PIPING – HA MBD PHASE 2, N.S.

  • Year: August 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia  Sdn. Bhd.
  • Scope: Procurement, Fabrication, Installation And Commissioning Of Pipeline And Process Piping With Certified ISO 9001:2008
  • Total Dia-Inch: 38,000 Dia-Inch Piping

HA-MBD PROJECTS PHASE (II)

  • Year: MAY 2015
  • Owner: Technip Geoproduction (M) Sdn. Bhd.
  • Scope: HA-MBD PHASE II (Mechanical Piping, Painting & Insulation Package)

PENGEREANG PIPELINE REGASTIFICATION PCC RGT2

  • Year: March 2015
  • Owner: PBJV Group
  • Scope: Cutting Soil, excavate for earth including hard materials and fill to designated proposed

RFPC, HA MBD PROJECT, N.S.

  • Year: February 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
  • Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.
  • Total Dia-Inch: 630 Dia-In In Piping, 10 And 20 Metric Ton Structure

TOX-2 (FLARE) PIPING MODIFICATION

  • Year: February 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
  • Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.

NEW IA LINE PANEL TO ANDRITZ, HA- MBD PROJECT N.S

  • Year: January 2015 
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Installation Of IA Tubing & Equipment To Andritz at Preform Area

PCC (RGT 2) PENGERANG PIPELINE, JOHOR BAHRU

  • Year: November 2014
  • Owner: Petronas Gas Berhad
  • Scope: Services  Support To Cpm Construction Sdn Bhd
    o    Nde
    o    Heavy Machinery
    o    Third Party Inspector
    o    Diesel Supply
    o    Perform Wqt
    o    Inspection Site Boom
    o    Site Clearing 32 Km

ACCESS PLATFORM AT V1 AREA & UTILITY AREA, HA – MBD PROJECT N.S

  • Year: November 2014
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Installation Of Steel Structures At V1 Area & Utility Area 

MODIFICATION WORKS TO ROOF REPAIR, HA – MBD PROJECT N.S

  • Year: November 2014
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Piping Installation & Modification Works To Roof Repair

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: October 2014
  • Owner: CPM Construction Sdn. Bhd.
  • Scope: Cutting/Chipping Trees Along ROW.

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: October 2014
  • Owner: CPM Construction Sdn. Bhd.
  • Scope: Disposal Trees to Dumping Area

About Us

logoAXIANERGY (M) SDN. BHD. started its journey with its inception in Nov 2014 founded by a group of people who are highly passionate, innovative, committed and backed with years of experience involved in the construction industry.

Read More

Contact Us

AXIANERGY (M) SDN. BHD.

Tel: +606-792 2154

Fax:+606-792 2451

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Business Address:
No. 18 & 18-1, Persiaran Metro Sendayan 1, Sendayan Metropark, 71950 Bandar Sri Sendayan, Seremban, Negeri Sembilan

Site Visitor

0.png3.png2.png8.png2.png0.png
Today64
Yesterday56
This week264
This month912
Total32820

Thursday, 13 December 2018 17:35