HomeProjectsProject Listing

Project Listing

  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
NO PROJECTS CLIENT SCOPE OF WORKS LOCATION STATUS
1 REPAIR AND REHABILITATION OF PIPELINE FACILITIES OPERATED BY PETRONAS GAS BERHAD - GAS TRANSMISSION & REGASIFICATION (PGB-GTR) (REHAB) PETRONAS GAS BHD

DIG-UP AND VERIFICATION UG PIPE FOR SOUTHERN REGION

SITIAWAN, PERAK

GURUN , PERAK

Completed

2 EPCC OF NPS 36 PULAU INDAH LATERAL PIPELINE (TULIP) PETRONAS GAS BHD

INSTALL NPS GAS PIPELINE, SL, SR, BV, TOV AND METERING STATION

KLANG, SELANGOR

Ongoing

NO PROJECTS CLIENT SCOPE OF WORKS LOCATION STATUS
1 EPCC OF KLIA PIPELINE PROJECT (KLIPP) PETRONAS GAS BHD

PIPELINE & LAUNCHER STATION

KLIA, SEPANG

Completed

2 EPCC OF MANGOSTEEN - BIOMASS CONVERSION TO BIO-MONOETHYLENE GLYCOL (BIO-MEG) PETRONAS RESEARCH SDN BHD

PROCESS PLANT

BANGI, SELANGOR

Completed

3 EPCC OF NEW PRESSURE CONTROL VALVE (PCV) INSTALLATION AT ML 504 STATION (PMIX) PETRONAS GAS BHD INSTALL PRESSURE CONTROL VALVE (PCV) IN BLOCK VALVE STATION ML 504 PASIR GUDANG, JOHOR Completed

 

 

 

NO PROJECTS CLIENT SCOPE OF WORKS LOCATION STATUS
1 EPCC OF HENGYUAN REFINING COMPANY (HRC) METERING STATION PROJECT (HYREC) PETRONAS GAS BHD

MECHANICAL, PIPING, CIVIL E&I & STRUCTURE

PORT DICKSON, NEGERI SEMBILAN

Completed

NO PROJECTS CLIENT SCOPE OF WORKS LOCATION STATUS
1 Utilities Installation RFPC SAFRAN, MESSIER BUGATTI DOWTY

-Installation of paint booth

-Supply Electrical Material

SENDAYAN,NEGERI SEMBILAN Completed
2 EPCC of TEBONG CITY GATE STATION UPGRADING (TURBO) PETRONAS GAS BHD

-Underground Utilities Detection,Line Tracing,Trial holes for existing utilities/pipeline

-Dismantling,Packaging,Transportating & Relocating of Existing Facilities

TEBONG, MELAKA Completed
3  EPCC of TELOK GONG LOOP PIPELINE (TUAH) PETRONAS GAS BHD 

-Hot Tap Station

-Scarapper Launcher Station

-Install a new NPS 28 Gas Pipeline (Telok Gong Loop Pipeline) approx. 22km from Taboh Naning to Kuala Sungai Baru Melaka

-Block Valve Station

-Take Off Stations

-Scrapper Receiver/Metering Station

ALOR GAJAH, MELAKA   Completed
4 REMAINING WORKS FOR PENGERANG GAS PIPELINE PROJECT (REINITE) - PACKAGE A  PETRONAS GAS BHD

-Fabrication,Supply and Installation of Aerial Marker and ROW warning Signages.

-Supply & Install Drop Gate

PENGERANG, JOHOR   Completed
NO PROJECTS CLIENT SCOPE OF WORKS LOCATION STATUS
1 MAINTENANCE SAFRAN,MESSIER BUGATTI DOWTY SUPPLY OF EXPANSION JOINTS SENDAYAN,NEGERI SEMBILAN Completed
2 PIPE SLEEPER & UNDERGROUND SERVICES PKG NO.22 AT RAPID BINA PURI SDN BHD

PIPE SLEEPER & UNDERGROUND

SERVICES

PKG 22 AT RAPID PROJECT (CIVIL & PIPELINE)

PENGERANG,JOHOR Completed
3 PROLONGATION & REMOBILISATION CODT FOR CIVIL & STRUCTURE WORKS PBJV GROUP

RGT2-Pengerang Pipeline - Station

Civil Work (SR500,SR501,ML502,ML503,ML504

,ML505,

TOV511A,TOV511B and TOV512) -FOR PERIOD

OF MID JAN 2017 UNTIL MAY 2017

PENGERANG,JOHOR Completed
4 MAINTENANCE SAFRAN,MESSIER BUGATTI DOWTY SUPPLY OF EXPANSION JOINTS SENDAYAN,NEGERI SEMBILAN Completed
5 PIPING MODIFICATION WORK SAFRAN,MESSIER BUGATTI DOWTY

INSTALLATION OF CLEAM-OUT

POINTS FOR

PIPES F601 UNTIL F606, INSTALLATION OF

VALVES FOR F601 & F602, REINSTALLATION OF PIPELINE INSULATION ON VT LINES FOR F601 & F602

SENDAYAN,NEGERI SEMBILAN Completed
6 MAINTENANCE SAFRAN,MESSIER BUGATTI DOWTY SUPPLY OF MATERIAL SENDAYAN,NEGERI SEMBILAN Completed
7 MODIFICATION WORK SAFRAN,MESSIER BUGATTI DOWTY INSTALLATION OF TRUNNION SUPPORT SENDAYAN,NEGERI SEMBILAN Completed
8 MECHANICAL FABRICATION AND INSTALLATION WORK TRANSWATER API SDN BHD EPCC OF GEBENG 2 CITY GATE STATION PROJECT (GBEST) GEBENG,PAHANG Completed
 9 ANCILLARY WORKS AND SERVICES TRANSWATER API SDN BHD EPCC OF KLUANG CITY GATE STATION UPGRADING  KLUANG,JOHOR Completed
 10 MAINTENANCE  SAFRAN,MESSIER BUGATTI DOWTY RELOCATION OF FLARE LINE INCLUSIVE SUPPLY OF MATERIALS SENDAYAN,NEGERI SEMBILAN Completed
11 EPIC INSTALL OF FLAME ARRESTOR AT SEGAMAT STATION PETRONAS GAS BERHAD INSTALLATION OF FLAME ARRESTOR & SECONDRY DRY GAS SEAL MONITORING  SEGAMAT,JOHOR Completed
12 STEP IN SCOPE FOR NETSS TELUK KALUNG PETRONAS GAS BERHAD STEP IN SCOPE FOR NEW EXPORT TERMINAL SCRAPPER STATION (NETSS) KEMAMAN,TERENGGANU Completed

 

 

 

NO PROJECTS CLIENT SCOPE OF WORKS LOCATION STATUS
1 HA-MBD Projects (PHASE II) SAFRAN, MESSIER BUGATTI DOWTY Single Tied Expansion Joint SENDAYAN,NEGERI SEMBILAN Completed
2 HA-MBD Projects (PHASE II) TECHNIP GEOPRODUCTION (M) SDN BHD Civil Detail Engineering Service For New Transformer and Switchgear Building SENDAYAN,NEGERI SEMBILAN Completed 
3 HA-MBD Projects (PHASE II) TECHNIP GEOPRODUCTION (M) SDN BHD HA-MBD PHASE II (Mechanical,Piping,Painting & Insulation Package)  SENDAYAN,NEGERI SEMBILAN Completed
4 HA-MBD Projects (PHASE II) TECHNIP GEOPRODUCTION (M) SDN BHD CNC : Final Machining #2 Cell Installation Works SENDAYAN,NEGERI SEMBILAN Completed
5 Firewater Network Eastside (Packages 14-0701) PBJV GROUP Procurement,Construction And Commissioning Of Underground Pressurised Non-Metalic Piping PENGERANG,JOHOR Completed
6 Pengerang Pipeline Regasification, PCC RGT2 PBJV GROUP Provision of construction of 2 Nos of Hardstands,Access Road and Ancillary Works For River Crossings at Sungai Layau and Sungai Lebam for Pengerang Gas Pipeline PEGERANG,JOHOR Completed

 

NO

PROJECTS CLIENT SCOPE OF WORKS LOCATION STATUS
1

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Cutting/Chipping Trees Along ROW

PENGERANG,

JOHOR

Completed
2

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Disposal Trees to Dumping Area

PENGERANG,

JOHOR

Completed
3

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Supply Diesel

PENGERANG,

JOHOR

Completed
4

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

3rd Party Overtime

PENGERANG,

JOHOR

Completed
5

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

MT/UT Inspection

PENGERANG,

JOHOR

Completed
6

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

NDT & 3rd Party Production

PENGERANG,

JOHOR

Completed
7

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Rental Excavator c/w Operator and Overtime

Cost

PENGERANG,

JOHOR

Completed
8

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Rental 3MT Fuel Truck Diesel

PENGERANG,

JOHOR

Completed
9

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Supply Gases

PENGERANG,

JOHOR

Completed
10

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Supply Welding Set 

PENGERANG,

JOHOR

Completed
11

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Welder Qualification Test (WQT) & Mechanical

Test

PENGERANG,

JOHOR

Completed
12

Pengerang Pipeline Regasification, PCC

RGT2

CPM CONSTRUCTION

SDN BHD

Additional NDT Production

PENGERANG,

JOHOR

Completed
13

Installation of IA Panel

to Andritz

SAFRAN,MESSIER BUGATTI DOWTY (HA-MBD)

Installation of IA tubing panel to Andritz, Safran

Preform Area

SENDAYAN,

NEGERI SEMBILAN

Completed
14

HA-MBD Projects

(PHASE II) RFPC

TECHNIP GEOPRODUCTION

(M) SDN BHD 

Procurement,Construction, Pre-Commisioning,

Piping Installation,Mechanical Work and Civil

Structure

SENDAYAN,

NEGERI SEMBILAN

Completed
15

Water Pipe for Condensate

Coil Cleaning

SAFRAN, MESSIER BUGATTI DOWTY

Supervision,labor,transportation,tools and

consumables and euipment. Service Test

SENDAYAN,

NEGERI SEMBILAN

Completed
16

HA-MBD Projects

(PHASE II) Recycler Skid 602U2

TECHNIP GEOPRODUCTION

(M) SDN BHD

Skid Installation and piping connection

SENDAYAN,

NEGERI SEMBILAN

Completed
17 Pengerang Pipeline Regasification, PCC RGT2 PBJV GROUP

RGT2 - Pengerang Pipeline - Station Civil

Work (SR500, SR501,ML502,ML503,ML504,

ML505, OV511A,TOV511B and TOV512)

PENGERANG,

JOHOR

Completed
18 Pengerang Pipeline Regasification, PCC RGT2 PBJV GROUP

Cutting soil,excavate for earth including hard

materials and fill to designated proposed

PENGERANG,

JOHOR

Completed

 

 pic1

Project Highlights

EPCC OF NPS 36 PULAU INDAH LATERAL PIPELINE (TULIP)

  • Year: 2021
  • Owner: Petronas Gas Bhd
  • Scope: Install NPS 36 gas pipeline, SL, SR, BV, TOV and metering station

REPAIR AND REHABILITATION OF PIPELINE FACILITIES OPERATED BY PETRONAS GAS BERHAD – GAS TRANSMISSION & REGASIFICATION (PGB-GTR) (REHAB)

  • Year: 2021
  • Owner: Petronas Gas Bhd
  • Scope: Dig-up and verification UG pipe for southern region

EPCC OF NEW PRESSURE CONTROL VALVE (PCV) INSTALLATION AT ML 504 STATION (PMIX)

  • Year: 2020
  • Owner: Petronas Gas Bhd
  • Scope: Install pressure control valve (PCV) in block valve station ML 504

EPCC OF PROJECT MANGOSTEEN - BIOMASS CONVERSION TO BIO-MONOETHYLENE GLYCOL (BIO-MEG)

  • Year: 2020
  • Owner: Petronas Research Sdn Bhd
  • Scope: Process Plant

EPCC OF KLIA PIPELINE PROJECT (KLIPP)

  • Year: 2020
  • Owner: Petronas Gas Berhad
  • Scope: Pipeline & Launcher Station.

EPCC OF HENGYUAN REFINING COMPANY (HRC) METERING STATION PROJECT (HYREC)

  • Year: 2019
  • Owner: Petronas Gas Berhad
  • Scope: Mechanical, Piping, Civil E&I & Structure.

EPCC OF TELOK GONG LOOP PIPELINE, MELAKA (TUAH)

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Hot Tap Station, Scarapper Launcher Station, Install a new NPS 28 Gas Pipeline (Telok Gong Loop Pipeline) approx. 22km from Taboh Naning to Kuala Sungai Baru Melaka, Block Valve Station, Take Off Station and Scarapper Receiver/Metering Station.

REMAINING WORKS FOR PENGERANG GAS PIPELINE PROJECT (REINITE) - PACKAGE A

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Fabrication, Supply and Installation of Aerial Marker & ROW Warning Signages, Supply and Install Drop Gate

UTILITIES INSTALLATION RFPC

  • Year: 2018
  • Owner: SAFRAN MESSIER BUGATTI DOWTY
  • Scope: Installation of paint booth and Supply Electrical Material

EPCC OF TEBONG CITY GATE STATION UPGRADING PROJECT, MELAKA (TURBO)

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Underground Utilities Detection, Line Tracing, Trial holes for existing utilities/pipeline and Dismantling, Packaging, Transportating & Relocating of existing facilities.

 PIPE SLEEPER AND UNDERGROUND SERVICES PACKAGE-22 AT RAPID PROJECT

  • Year:  Feb 2017
  • Owner: BINA PURI Sdn Bhd
  • Scope: Pipe Sleeper And Underground Services Package 22 At Rapid Project (Civil And Pipeline)

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: January 2016
  • Owner: PBJV Group
  • Scope: Provision of Construction of 2 Nos Hardstand, Access Road and Ancillary Works For River Crossings at Sungai Layau and Sungai Lebam For Pengerang Gas Pipeline.

HA-MBD PROJECT PHASE (II) 

  • Year: January 2016
  • Owner: Technip Geoproduction (M) Sdn. Bhd.
  • Scope: Civil Detail Engineering Services For New Transformer and Switchgear Building.

HA-MBD PROJECTS (PHASE II)

  • Year: November 2015
  • Owner: Technip Geoproduction Sdn. Bhd.
  • Scope: CNC: Final Machining #2 sell Installation Works

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: September 2015
  • Owner: PBJV GROUP
  • Scope: RGT2- Pengerang Pipeline-Station Civil Work (SR500,SR501, ML502, ML504, ML505, OV511A, TOV511B, and TOV512) 

C&S WORKS – MAINLINE VALVE STATION AT PENGERANG, JOHOR

  • Year: September 2015
  • Owner: Petronas Gas Berhad
  • Scope: C&S Works at Mainline Valve Station For Procurement Construction And Commissioning  (PCC) of Pengerang Gas Pipeline (PGP) Project

INSTALLATION OF MECHANICAL EQUIPMENT – HA MBD PHASE 2, N.S.

  • Year: August 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia  Sdn. Bhd.
  • Scope: Installation Of Mechanical Equipment With Certified ISO 9001:2008
  • Single Lifting Of Furnace : 25 Tonnes

PROCUREMENT, FABRICATION, INSTALLATION AND COMMISSIONING OF PIPELINE AND PROCESS PIPING – HA MBD PHASE 2, N.S.

  • Year: August 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia  Sdn. Bhd.
  • Scope: Procurement, Fabrication, Installation And Commissioning Of Pipeline And Process Piping With Certified ISO 9001:2008
  • Total Dia-Inch: 38,000 Dia-Inch Piping

HA-MBD PROJECTS PHASE (II)

  • Year: MAY 2015
  • Owner: Technip Geoproduction (M) Sdn. Bhd.
  • Scope: HA-MBD PHASE II (Mechanical Piping, Painting & Insulation Package)

PENGEREANG PIPELINE REGASTIFICATION PCC RGT2

  • Year: March 2015
  • Owner: PBJV Group
  • Scope: Cutting Soil, excavate for earth including hard materials and fill to designated proposed

RFPC, HA MBD PROJECT, N.S.

  • Year: February 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
  • Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.
  • Total Dia-Inch: 630 Dia-In In Piping, 10 And 20 Metric Ton Structure

TOX-2 (FLARE) PIPING MODIFICATION

  • Year: February 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
  • Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.

NEW IA LINE PANEL TO ANDRITZ, HA- MBD PROJECT N.S

  • Year: January 2015 
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Installation Of IA Tubing & Equipment To Andritz at Preform Area

PCC (RGT 2) PENGERANG PIPELINE, JOHOR BAHRU

  • Year: November 2014
  • Owner: Petronas Gas Berhad
  • Scope: Services  Support To Cpm Construction Sdn Bhd
    o    Nde
    o    Heavy Machinery
    o    Third Party Inspector
    o    Diesel Supply
    o    Perform Wqt
    o    Inspection Site Boom
    o    Site Clearing 32 Km

ACCESS PLATFORM AT V1 AREA & UTILITY AREA, HA – MBD PROJECT N.S

  • Year: November 2014
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Installation Of Steel Structures At V1 Area & Utility Area 

MODIFICATION WORKS TO ROOF REPAIR, HA – MBD PROJECT N.S

  • Year: November 2014
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Piping Installation & Modification Works To Roof Repair

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: October 2014
  • Owner: CPM Construction Sdn. Bhd.
  • Scope: Cutting/Chipping Trees Along ROW.

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: October 2014
  • Owner: CPM Construction Sdn. Bhd.
  • Scope: Disposal Trees to Dumping Area

About Us

logoAXIANERGY (M) SDN. BHD. started its journey with its inception in Nov 2014 founded by a group of people who are highly passionate, innovative, committed and backed with years of experience involved in the construction industry.

Read More

Contact Us

AXIANERGY (M) SDN. BHD.

Tel: +606-792 2154

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Business Address:
No. 277 & 277-1, Jalan Pusat Dagangan Sendayan 3/5, Sendayan Merchant Square, 71950 Bandar Sri Sendayan, Seremban, Negeri Sembilan

Site Visitor

2.png5.png8.png5.png0.png0.png
Today79
Yesterday119
This week691
This month2476
Total258500

Saturday, 21 December 2024 19:36