HomeGalleryCompany Activities

Cart

Company Activities

 

 pic1

Project Highlights

EPCC OF NPS 36 PULAU INDAH LATERAL PIPELINE (TULIP)

  • Year: 2021
  • Owner: Petronas Gas Bhd
  • Scope: Install NPS 36 gas pipeline, SL, SR, BV, TOV and metering station

REPAIR AND REHABILITATION OF PIPELINE FACILITIES OPERATED BY PETRONAS GAS BERHAD – GAS TRANSMISSION & REGASIFICATION (PGB-GTR) (REHAB)

  • Year: 2021
  • Owner: Petronas Gas Bhd
  • Scope: Dig-up and verification UG pipe for southern region

EPCC OF NEW PRESSURE CONTROL VALVE (PCV) INSTALLATION AT ML 504 STATION (PMIX)

  • Year: 2020
  • Owner: Petronas Gas Bhd
  • Scope: Install pressure control valve (PCV) in block valve station ML 504

EPCC OF PROJECT MANGOSTEEN - BIOMASS CONVERSION TO BIO-MONOETHYLENE GLYCOL (BIO-MEG)

  • Year: 2020
  • Owner: Petronas Research Sdn Bhd
  • Scope: Process Plant

EPCC OF KLIA PIPELINE PROJECT (KLIPP)

  • Year: 2020
  • Owner: Petronas Gas Berhad
  • Scope: Pipeline & Launcher Station.

EPCC OF HENGYUAN REFINING COMPANY (HRC) METERING STATION PROJECT (HYREC)

  • Year: 2019
  • Owner: Petronas Gas Berhad
  • Scope: Mechanical, Piping, Civil E&I & Structure.

EPCC OF TELOK GONG LOOP PIPELINE, MELAKA (TUAH)

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Hot Tap Station, Scarapper Launcher Station, Install a new NPS 28 Gas Pipeline (Telok Gong Loop Pipeline) approx. 22km from Taboh Naning to Kuala Sungai Baru Melaka, Block Valve Station, Take Off Station and Scarapper Receiver/Metering Station.

REMAINING WORKS FOR PENGERANG GAS PIPELINE PROJECT (REINITE) - PACKAGE A

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Fabrication, Supply and Installation of Aerial Marker & ROW Warning Signages, Supply and Install Drop Gate

UTILITIES INSTALLATION RFPC

  • Year: 2018
  • Owner: SAFRAN MESSIER BUGATTI DOWTY
  • Scope: Installation of paint booth and Supply Electrical Material

EPCC OF TEBONG CITY GATE STATION UPGRADING PROJECT, MELAKA (TURBO)

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Underground Utilities Detection, Line Tracing, Trial holes for existing utilities/pipeline and Dismantling, Packaging, Transportating & Relocating of existing facilities.

 PIPE SLEEPER AND UNDERGROUND SERVICES PACKAGE-22 AT RAPID PROJECT

  • Year:  Feb 2017
  • Owner: BINA PURI Sdn Bhd
  • Scope: Pipe Sleeper And Underground Services Package 22 At Rapid Project (Civil And Pipeline)

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: January 2016
  • Owner: PBJV Group
  • Scope: Provision of Construction of 2 Nos Hardstand, Access Road and Ancillary Works For River Crossings at Sungai Layau and Sungai Lebam For Pengerang Gas Pipeline.

HA-MBD PROJECT PHASE (II) 

  • Year: January 2016
  • Owner: Technip Geoproduction (M) Sdn. Bhd.
  • Scope: Civil Detail Engineering Services For New Transformer and Switchgear Building.

HA-MBD PROJECTS (PHASE II)

  • Year: November 2015
  • Owner: Technip Geoproduction Sdn. Bhd.
  • Scope: CNC: Final Machining #2 sell Installation Works

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: September 2015
  • Owner: PBJV GROUP
  • Scope: RGT2- Pengerang Pipeline-Station Civil Work (SR500,SR501, ML502, ML504, ML505, OV511A, TOV511B, and TOV512) 

C&S WORKS – MAINLINE VALVE STATION AT PENGERANG, JOHOR

  • Year: September 2015
  • Owner: Petronas Gas Berhad
  • Scope: C&S Works at Mainline Valve Station For Procurement Construction And Commissioning  (PCC) of Pengerang Gas Pipeline (PGP) Project

INSTALLATION OF MECHANICAL EQUIPMENT – HA MBD PHASE 2, N.S.

  • Year: August 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia  Sdn. Bhd.
  • Scope: Installation Of Mechanical Equipment With Certified ISO 9001:2008
  • Single Lifting Of Furnace : 25 Tonnes

PROCUREMENT, FABRICATION, INSTALLATION AND COMMISSIONING OF PIPELINE AND PROCESS PIPING – HA MBD PHASE 2, N.S.

  • Year: August 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia  Sdn. Bhd.
  • Scope: Procurement, Fabrication, Installation And Commissioning Of Pipeline And Process Piping With Certified ISO 9001:2008
  • Total Dia-Inch: 38,000 Dia-Inch Piping

HA-MBD PROJECTS PHASE (II)

  • Year: MAY 2015
  • Owner: Technip Geoproduction (M) Sdn. Bhd.
  • Scope: HA-MBD PHASE II (Mechanical Piping, Painting & Insulation Package)

PENGEREANG PIPELINE REGASTIFICATION PCC RGT2

  • Year: March 2015
  • Owner: PBJV Group
  • Scope: Cutting Soil, excavate for earth including hard materials and fill to designated proposed

RFPC, HA MBD PROJECT, N.S.

  • Year: February 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
  • Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.
  • Total Dia-Inch: 630 Dia-In In Piping, 10 And 20 Metric Ton Structure

TOX-2 (FLARE) PIPING MODIFICATION

  • Year: February 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
  • Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.

NEW IA LINE PANEL TO ANDRITZ, HA- MBD PROJECT N.S

  • Year: January 2015 
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Installation Of IA Tubing & Equipment To Andritz at Preform Area

PCC (RGT 2) PENGERANG PIPELINE, JOHOR BAHRU

  • Year: November 2014
  • Owner: Petronas Gas Berhad
  • Scope: Services  Support To Cpm Construction Sdn Bhd
    o    Nde
    o    Heavy Machinery
    o    Third Party Inspector
    o    Diesel Supply
    o    Perform Wqt
    o    Inspection Site Boom
    o    Site Clearing 32 Km

ACCESS PLATFORM AT V1 AREA & UTILITY AREA, HA – MBD PROJECT N.S

  • Year: November 2014
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Installation Of Steel Structures At V1 Area & Utility Area 

MODIFICATION WORKS TO ROOF REPAIR, HA – MBD PROJECT N.S

  • Year: November 2014
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Piping Installation & Modification Works To Roof Repair

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: October 2014
  • Owner: CPM Construction Sdn. Bhd.
  • Scope: Cutting/Chipping Trees Along ROW.

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: October 2014
  • Owner: CPM Construction Sdn. Bhd.
  • Scope: Disposal Trees to Dumping Area

About Us

logoAXIANERGY (M) SDN. BHD. started its journey with its inception in Nov 2014 founded by a group of people who are highly passionate, innovative, committed and backed with years of experience involved in the construction industry.

Read More

Contact Us

AXIANERGY (M) SDN. BHD.

Tel: +606-792 2154

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Business Address:
No. 277 & 277-1, Jalan Pusat Dagangan Sendayan 3/5, Sendayan Merchant Square, 71950 Bandar Sri Sendayan, Seremban, Negeri Sembilan

Site Visitor

2.png5.png8.png7.png6.png3.png
Today197
Yesterday145
This week954
This month2739
Total258763

Sunday, 22 December 2024 21:17